EnviroTech International supplied, tested and commissioned 8no x 10,000m3 per Day SWRO Desalination Plants with our Super-Flow Multimedia Filters for the Abu Dhabi SARB Island Projects with main contractor Habtoor Leighton Group (HLG), the project included Factory Acceptance Tests (FAT) in England at our Engineering and Manufacturing Facilities with the Consultant Dorsch Group, HLG, Bureau Veritas and ADNOC.
The UK and USA manufactured Off Shore Desalination SWRO Plants were supplied as Containerized Plants for Drinking Water to the Staff Accommodation on the SARB Islands (off Zirku Island) in the Arabian Gulf.
EnviroTech Egypt facilitated a collaboration between UK Collaboration Partners in the signing of a Build Own Operate Transfer (BOOT) contract for the Wastewater Treatment of up to 50,000m3 per Day Produced Water from Off Shore Oil Rigs in the Red Sea, the On Shore Water Treatment Facility will treat the Produced Water for final discharge to the Red Sea conforming to the Egyptian Environment Agency (EEAA) regulations.
The On Shore Produced Water Treatment Plant will consist of a series of bespoke UK and USA manufactured Industrial Water Treatment Technologies.
EnviroTech Egypt has recently been awarded a Produced Wastewater Treatment contract for the Engineering Design, Supply, Installation Supervision, Testing and Commissioning as well as an Operation and Maintenance contract to include Full Maintenance Services with an onsite Water Sample Testing Lab, in the Western Desert in Egypt.
The joint UK, Egypt and USA manufactured Package Water Treatment Plant will treat up to 10,000m3 per day reducing the Oil Content and Total Suspended Solids (TSS) based on duty standby operation. Our water treatment process includes a CPI Separator (Clarifier), Nutshell Filters, and finally Cartridge Filters as a water polishing final stage, if necessary.
The treated and filtered Produced Water will be a great Water Re-Use opportunity with key Environmental Benefits.
EnviroTech International supplied, tested and commissioned 8no 10,000m3 per Day Electrocoagulation Wastewater Treatment Plants for ADNOC at the Abu Dhabi SARB Island Projects off Zirku Island with main contractor Habtoor Leighton Group (HLG), the project included Factory Acceptance Tests (FAT) in England, UK at our Engineering Design and Manufacturing Facilities with the Consultant Dorsch Group, Main Contractor HLG and Third-Party Bureau Veritas.
The Offshore Water Treatment Plants manufactured in the UK will treat the Wastewater for final discharge to the Arabian Gulf conforming to the Abu Dhabi Marine Agency regulations.
EnviroTech provided Engineering Solutions including Front End Engineering (FEED) and Detailed Design for a 60,000m3 per Day Desalination Plant with our Super-Flow Multimedia Filters in Thawal, Saudi Arabia.
The main SWRO equipment mainly manufactured in UK and USA has been supplied, tested and commissioned in accordance with strict QAQC Guidelines with the main contractor Saudi Aramco, the project included a full Commissioning Protocols prior to Handover together with the Consultant and Bureau Veritas.
The Desalination Plant will treat the Seawater from the Red Sea and provide clean water to the University for Fresh Water provisions.
EnviroTech International provided Full Engineering, Supply, Installation Supervision, Testing and Commissioning for a 5,000m3 per Hour Super-Flow Multimedia Filter Plant by using a proprietary Deep Bed Filtration technique at the KPMG Offices in Canary Wharf, London.
The Greywater System will collect all AC Blowdown and Greywater, then further process the greywater through the Greywater Reuse Package Plant to provide recycled water for flushing, cleaning and irrigation with strict QAQC with the main contractor Skanska and MEP company NG Bailey.
The Greywater Reuse Plants were the first in a series of installations in the London Docklands and the City of London, United Kingdom.
EnviroTech International provided Air Conditioning Chiller Energy Saving Systems for Dubai Oasis Towers as a total AC Energy Saving Solution for the Apartment Towers. The Real Time Chiller Energy Management System saves up to 30% of Airconditioning Energy Consumption and Energy Costs resulting in an 18 month Return on Investment (ROI). A Full Service, Operation and Maintenance Package and 5 Year Equipment and Energy Savings Guarantee is also included in the Project Scope.
The ChillerSaver™ System and the Aircon Energy Savers have been used extensively throughout the UAE, KSA, Mexico, USA and Europe on a range of AC Chillers reducing up to 30% of Energy Consumption and Costs.
EnviroTech International have completed multiple Water Conservation installations save up to 60% of Water Consumption and Costs for 110no IACAD Mosque Sites in Dubai, UAE resulting in an 18 month return on investment (ROI). A Full Service, Operation and Maintenance Package and 6 Year Equipment and Savings Guarantee is also included in the Water Saving Project Scope.
All UK manufactured Water Conservation and Greywater Reuse Products are guaranteed for a minimum 3 Years extendable.